Natatoriums

This pool was constructed during an expansion of the high school for the Brownsburg Community School Corporation. This natatorium is used for lap swimming, recreation swimming, exercise classes, swim meets and many other activities.

This Natatorium includes:
  • 10,899 sq.ft. 8-lane 50-meter Myrtha pool
  • Two moveable Myrtha bulkheads
  • Three 1-meter Springboards
  • One 3-meter Springboard
  • Ultraviolet light treatment system
  • Spectator seating gallery
  • Subsurface agitation system

 

The natatorium serves as a key training venue to BBCS. This facility also plays host to IHSAA boys and girls sectionals, Diving regional’s, Hoosier Crossroads Conference boys and girls, Indiana Swimming Hall of Fame Classic and numerous USS swim meets throughout the year.









This natatorium was built to replace the high schools aging pool. This natatorium is used for PE classes, lap swimming, recreational swimming, exercise classes, swim meets and many other activities. There’s not a bad view in the natatorium with an elevated spectator seating area that stretches the length of the pool.

This Natatorium includes:
  • 12,300 square foot 50-meter pool
  • 8 competition lanes or 19 training lanes
  • Deck level gutter system
  • Ceramic tile and Diamond Brite finish
  • Two 1-meter Springboards
  • Colorado timing system
  • Defender regenerative media filter system
  • Ultraviolet light treatment system

 

The natatorium serves as a key training venue to NSC. This facility also plays host to IHSAA boy’s and girl’s sectionals and numerous USS swim meets throughout the year.

 

This natatorium was constructed during an expansion and renovation of the high school for the MSD of Decatur Township School Corporation. This natatorium is used for lap swimming, recreation swimming, exercise classes, swim meets and many other activities.

This Natatorium includes:
  • 7,560 sq.ft. 25-yard stretch pool
  • Stark fiberglass bulkhead
  • 8 competition lanes
  • Water polo course
  • Two 1-meter Springboard
  • Second story spectator seating
  • Daktronics timing system
  • Kiefer Intrepid S.S. starting blocks
  • Defender regenerative media filter system
  • Ultraviolet light treatment system

 

In the near future, this facility plans to host IHSAA boy’s and girl’s sectionals, Diving regional’s, boy’s and girl’s Mid State Conference, and numerous USS swim meets throughout the year.



This pool was constructed during the 450,000 square foot high school expansion for the Franklin Community School Corporation. This natatorium is used for lap swimming, recreation swimming, exercise classes, swim meets and many other activities.

This Natatorium includes:
  • 12,975 sq.ft. 8-lane 50-meter Myrtha pool
  • Learn to swim teaching area
  • Two moveable Myrtha bulkheads
  • Two 1-meter Springboards
  • One 3-meter Springboard
  • Full color matrix scoreboard
  • Ultraviolet light treatment system

 

The natatorium serves as a key training venue to FRST. This facility also plays host to IHSAA boy’s and girl’s sectionals, Mid-State Conference boy’s and girl’s, Indiana Swimming Hall of Fame Classic and numerous USS swim meets throughout the year.



This natatorium was built to upgrade the school corporations aging pool. This natatorium is used for PE classes, lap swimming, recreation swimming, exercise classes, swim meets and many other activities. There is not a bad view in the natatorium with an elevated spectator seating area that stretches the length of the pool.

This Natatorium includes:
  • 12,975 square foot 10-lane 50-meter  pool
  • 8 competition lanes or 14 training lanes
  • Parapet gutter system
  • Ceramic tile and Diamond Brite finish
  • One moveable Stark bulkhead
  • Three 1-meter Springboards
  • One 3-meter Springboard
  • Colorado timing system
  • Ultraviolet light treatment system

 

The natatorium serves as a key training venue to LST. This facility also plays host to IHSAA boys and girls sectionals and numerous USS swim meets throughout the year.



This natatorium was the first swimming pool in the State of Indiana to be renovated using Indiana Code 5-30-8 design-build. This natatorium is used for PE classes, lap swimming, recreation swimming, exercise classes, swim meets and many other activities. There is not a bad view in the natatorium with an elevated spectator seating area that stretches the length of the pool.

This Natatorium renovation included:
  • 4,725 square foot 8-lane competition pool
  • Separate diving well
  • Stainless steel gutter system l
  • RenoSys PVC membrane
  • Two concrete surge tanks
  • Eight SR Smith starting blocks
  • Ultraviolet light treatment system

 

This facility hosts numerous USS swim meets throughout the year.

 

 




This natatorium was built to upgrade the school corporations aging pool. This natatorium is used for PE classes, lap swimming, recreation swimming, exercise classes, swim meets and many other activities. There is not a bad view in the natatorium with an elevated spectator seating area that stretches the length of the pool.

This Natatorium includes:
  • 12,975 square foot 10-lane 50-meter pool
  • Deck level gutter system
  • Ceramic tile finish
  • Two moveable Stark bulkheads
  • Two 1-meter Springboards
  • One 3-meter Springboard
  • Colorado timing system
  • Ultraviolet light treatment system

 

The natatorium serves as a key training venue to WTSC. This facility also plays host to IHSAA boys sectionals, MIC Conference Championships, and numerous USS swim meets throughout the year.

 

 








The team of Spear Corporation and Moake Park Group designed one of the finest high school natatoriums in Indiana. This natatorium is used for lap swimming, recreation swimming, exercise classes, swim meets and many other activities.

This Natatorium includes:
  • 8,165 sq.ft. 25-yard stretch pool
  • Moveable fiberglass bulkhead
  • 10 competition lanes or 13 training lanes
  • Two 1-meter Springboard
  • One 3-meter springboard
  • Second story spectator seating
  • Full color matrix scoreboard
  • Relay take off platforms
  • Defender regenerative media filter system
  • Ultraviolet light treatment system

 

The natatorium serves as a key training venue to NASA along with being a first class facility to host championship events. Spear Corporations design paid attention to the smallest of details and has hit a home run with swimmers, coaches, officials and parents.

Swim Coach: Joe Keller

 

 

A few weeks after the end of Athens Olympic Games, the 7th edition of the Short Course World Swimming Championships was held in Conseco Fieldhouse located in Indianapolis. This facility was temporarily transformed into the world’s largest swimming centre, with more than 10,000 seats. In fact two temporary pools, one for competitions and the other for training, were built inside the arena using the exclusive Myrtha Technology. While the installation of the swimming pools was completed in only one week, the pools were removed in under 36 hours leaving not a drop of water behind.

This Venue included:
  • 6,150 square foot 8-lane temporary competition pool
  • 3,690 square foot 6-lane temporary warm-up pool
  • Removable headwalls
  • Exclusive Strahlenturbulenz water recirculation system
  • Four (4) world records
  • Five (5) championship records

 

 

 

 

This natatorium was built to upgrade the universities aging pool. This natatorium is used for fitness classes, recreation, age group swim meets, master swimming events and NCAA competition. Designed for various competitive levels and maximum usage, this natatorium will be a state of the art swim facility for the community and continue to produce some of the world’s fastest swimmers.

This Natatorium includes:
  • 12,975 square foot 8-lane 50-meter pool
  • Semi Recessed stainless steel gutter system
  • PVC Membrane finish
  • Two moveable Stainless Steel bulkheads
  • Two 1-meter Springboards
  • Two 3-meter Springboard
  • Diving Platform at 5, 7.5 and 10 meters
  • Daktronics timing system

 

 

 

 >